Belgrade Eye

Ada Ciganlija Bridge

Gazela Bridge Reconstruction

Hipodrom Intersection

Bypass Highway

Vojvođanska Street

Prokop Train Station

Join Our Community

PSP Farman Complex in Block 65

02 Jul 2010

» Introduction

The project is planned to be built in block 65, on the corner of Omladinskih Brigada Street and future route of the inner city half ring road (UMP), holding impressive 152.437 sqm of residential and office space. The buildings making this complex vary in height and form, so they break the usual uniformity of the New Belgrade’s blocks. The land lot for this development covers an area of 30.316 sqm and it is planned to construct 106.106 sqm of space above ground and another 46.331 sqm in underground floors including an underground garage with 545 parking places. The space in the buildings will be organized in 514 residential units and 100 commercial units, where entire office and business apartment segment will hold 37.058 sqm.

This complex is clearly divided into two sections, where in one dominates residential space while other houses large shopping center and office tower with offices and business apartments. It is interesting that when this tower is finished, it will be the tallest building of that kind in Belgrade with 39 floors and 146 meters tall structure.

According to the investors, they had special demand with the designers to bring the spirit of old town to New Belgrade. The complex will fully use all the advantages of comfort and privacy that offers life in New Belgrade, but also it will have features characteristic for the old town like small squares and pedestrian areas. This is especially visible in the design and function of the ground floors. The architectural solution was made by London studio "Fletcher Priest".

The construction is planned in two phases, where the first phase will include the construction of the residential section of the complex on the opposite side of Omladinskih brigade street, while the second phase will covers the construction of the shopping mall and office tower.

» Investor

PSP-Farman Holding

» Location

Block 65, New Belgrade

» Size

152.437 sq/m

» Deadlines

The first phase will commence in September 2010, with plans to complete the entire complex in 2013.

Visualisations of the Complex